03 October 2024

Upcoming Night Works

We will be carrying out night works from Monday the 7th to Friday the 18th of October, on a Monday to Friday basis, from 7pm to 7am. The area of works will be between the Maxol service station and the Dundrum Road junction. These night works are necessary to complete the installation of a new watermain as part of this project. The works are proposed to be undertaken at night to minimize disruption to domestic & commercial water supplies and to minimize disruption to traffic on Fr. Mathew Street.

Please refer to the letter drop in the Gallery Page for more information.

0 Comments
Read more about the article 02 October 2024
Night Time

02 October 2024

Ongoing Road Works

We are carrying out drainage and footpath works in the vicinity of homes over the coming weeks. During this period, we will have a three-way temporary traffic management system in place to capture the Blackthorn Grove housing estate. To assist us, we ask that vehicles exiting individual residential properties be careful and vigilant and follow the flow of traffic on the roadway.

When our works are passing through individual entrances, we will need to temporarily close the entrance to allow kerb installation and the pouring of concrete footpaths. We will be in touch with the relevant property owners on an individual basis to arrange a convenient time for these works to progress and be completed.

Please refer to the letter drop in the Gallery Page for more information.

0 Comments